22nd May 2020
The end of this week saw level 1 poured, the ground floor drainage approved, the ground floor being backfilled and compacted, and scaffolding start to go up on the North Eastern side of the building!
​
July 2021 - Structure takes shape!
The last level 3 slab pour area, pre-pour!
Monark from a distance! The tower crane is holding up a panel up whilst the props are connected to take over and hold it up.
What's Happening at Wadestown School?
July 2023 - Rata Block Refurbishment has Begun!
Our team were excited to set up site at Wadestown School and settle into their new home for the coming months. After a slow start to the project coordinating asbestos removal with weekends and School holidays, the team were able to get stuck into demolition to allow structural and carpentry works to begin. Scaffolding was installed around Rata block which was wrapped, this enable the roof replacement and skylight installation to be carried out without being impacted by the Wellington winter weather.
Our team are excited to be working with Wadestown School and the Board of Trustees, Team Architects, Gaze Consulting, and the Ministry of Education to Transform Rata Block for teachers and students to enjoy for many years to come.